抄録
In Japan, although the recycling of waste has been promoted, there may be various obstacles. This study focuses on construction waste, more specifically, construction sludge, which is less advanced in terms of recycling. Processing cost for materials recycled from construction sludge is higher compared to the cost of mining virgin materials. There are some additional difficulties including delays in schedules due to the time required for processing and the balance between supply and demand. Therefore, the benefit of recycling by adding the time factor to the evaluation model with consideration for cost and environmental load is quantitatively assessed. As a result, it is shown that the bottlenecks of construction sludge recycling are higher cost than the cost of mining of virgin materials, high heavy metal contents in the construction sludge, and delays in the recycling process.
本文言語 | English |
---|---|
ページ | 1868-1873 |
ページ数 | 6 |
DOI | |
出版ステータス | Published - 2015 |
外部発表 | はい |
イベント | 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2015 - Fukuoka, Kyushu, Japan 継続期間: 2015 11月 9 → 2015 11月 13 |
Other
Other | 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2015 |
---|---|
国/地域 | Japan |
City | Fukuoka, Kyushu |
Period | 15/11/9 → 15/11/13 |
ASJC Scopus subject areas
- 地盤工学および土木地質学
- 土壌科学