抄録
The long reach passive optical network (LR-PON) is a promising scheme for access networks that cover large areas. For designing an access network, an exact solution of the network performance (e.g., mean packet delay) is useful. Since long propagation delay causes unused time slots (idle time), and its effect on performance degradation is difficult to analyze, existing analysis of the LR-PON is done only for the no-idle time situation with modified optical line terminal (OLT) and each optical network unit (ONU). In this paper, we propose an exact solution of the mean packet delay for LR-PON with idle time. Our analytical solution is derived by a non-trivial extension of the existing work for the short range PON. We confirm a good match between the mean packet delay derived by the simulation and our analytical solution.
本文言語 | English |
---|---|
ホスト出版物のタイトル | 2015 IEEE Global Communications Conference, GLOBECOM 2015 |
出版社 | Institute of Electrical and Electronics Engineers Inc. |
ISBN(印刷版) | 9781479959525 |
DOI | |
出版ステータス | Published - 2016 2月 23 |
イベント | 58th IEEE Global Communications Conference, GLOBECOM 2015 - San Diego, United States 継続期間: 2015 12月 6 → 2015 12月 10 |
Other
Other | 58th IEEE Global Communications Conference, GLOBECOM 2015 |
---|---|
国/地域 | United States |
City | San Diego |
Period | 15/12/6 → 15/12/10 |
ASJC Scopus subject areas
- コンピュータ ネットワークおよび通信
- 電子工学および電気工学
- 通信