N2 - In contrast to the mechanical stirring method in which the ground soil and the modifying material are mixed and stirred by stirring blades and the improved body is formed in the ground, the high pressure injection stirring method is a method in which the improved diameter is changed due to soil condition and so on. There is a possibility that it can be changed with, and a method for easily confirming the shape, particularly the improved diameter, is highly desired. In this research, the authors propose and propose a method that can make "visualization" of this improvement situation and confirm the improved diameter in real time. Confirmation was made by measuring water quality in multiple items. From the results, it was confirmed that pH and the values of the other 5 items changed at the same time. And the change was due to the arrival of the cement slurry. Therefore, it can be said that real-time measurement is possible by visualization of improved diameter by water quality measurement conducted this time.
AB - In contrast to the mechanical stirring method in which the ground soil and the modifying material are mixed and stirred by stirring blades and the improved body is formed in the ground, the high pressure injection stirring method is a method in which the improved diameter is changed due to soil condition and so on. There is a possibility that it can be changed with, and a method for easily confirming the shape, particularly the improved diameter, is highly desired. In this research, the authors propose and propose a method that can make "visualization" of this improvement situation and confirm the improved diameter in real time. Confirmation was made by measuring water quality in multiple items. From the results, it was confirmed that pH and the values of the other 5 items changed at the same time. And the change was due to the arrival of the cement slurry. Therefore, it can be said that real-time measurement is possible by visualization of improved diameter by water quality measurement conducted this time.
KW - Ground improvement work
KW - High pressure injection
KW - PH
KW - Real-time checking system
UR - http://www.scopus.com/inward/record.url?scp=85041211071&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85041211071&partnerID=8YFLogxK
U2 - 10.21660/2018.41.7200
DO - 10.21660/2018.41.7200
M3 - Article
AN - SCOPUS:85041211071
SN - 2186-2982
VL - 14
SP - 167
EP - 172