TY - JOUR
T1 - Real-Time Urban Flood Forecasting Systems for Southeast Asia—A Review of Present Modelling and Its Future Prospects
AU - Chitwatkulsiri, Detchphol
AU - Miyamoto, Hitoshi
N1 - Publisher Copyright:
© 2023 by the authors.
PY - 2023/1
Y1 - 2023/1
N2 - Many urban areas in tropical Southeast Asia, e.g., Bangkok in Thailand, have recently been experiencing unprecedentedly intense flash floods due to climate change. The rapid flood inundation has caused extremely severe damage to urban residents and social infrastructures. In addition, urban Southeast Asia usually has inadequate capacities in drainage systems, complicated land use patterns, and a large vulnerable population in limited urban areas. To reduce the urban flood risk and enhance the resilience of vulnerable urban communities, it has been of essential importance to develop real-time urban flood forecasting systems for flood disaster prevention authorities and the urban public. This paper reviewed the state-of-the-art models of real-time forecasting systems for urban flash floods. The real-time system basically consists of the following subsystems, i.e., rainfall forecasting, drainage system modelling, and inundation area mapping. This paper summarized the recent radar data utilization methods for rainfall forecasting, physical-process-based hydraulic models for flood inundation prediction, and data-driven artificial intelligence (AI) models for the real-time forecasting system. This paper also dealt with available technologies for modelling, e.g., digital surface models (DSMs) for the finer urban terrain of drainage systems. The review indicated that an obstacle to using process-based hydraulic models was the limited computational resources and shorter lead time for real-time forecasting in many urban areas in tropical Southeast Asia. The review further discussed the prospects of data-driven AI models for real-time forecasting systems.
AB - Many urban areas in tropical Southeast Asia, e.g., Bangkok in Thailand, have recently been experiencing unprecedentedly intense flash floods due to climate change. The rapid flood inundation has caused extremely severe damage to urban residents and social infrastructures. In addition, urban Southeast Asia usually has inadequate capacities in drainage systems, complicated land use patterns, and a large vulnerable population in limited urban areas. To reduce the urban flood risk and enhance the resilience of vulnerable urban communities, it has been of essential importance to develop real-time urban flood forecasting systems for flood disaster prevention authorities and the urban public. This paper reviewed the state-of-the-art models of real-time forecasting systems for urban flash floods. The real-time system basically consists of the following subsystems, i.e., rainfall forecasting, drainage system modelling, and inundation area mapping. This paper summarized the recent radar data utilization methods for rainfall forecasting, physical-process-based hydraulic models for flood inundation prediction, and data-driven artificial intelligence (AI) models for the real-time forecasting system. This paper also dealt with available technologies for modelling, e.g., digital surface models (DSMs) for the finer urban terrain of drainage systems. The review indicated that an obstacle to using process-based hydraulic models was the limited computational resources and shorter lead time for real-time forecasting in many urban areas in tropical Southeast Asia. The review further discussed the prospects of data-driven AI models for real-time forecasting systems.
KW - artificial-intelligence-based models
KW - methodology
KW - physical-process-based models
KW - real-time forecasting
KW - regional implementation
KW - urban floods
UR - http://www.scopus.com/inward/record.url?scp=85145971805&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85145971805&partnerID=8YFLogxK
U2 - 10.3390/w15010178
DO - 10.3390/w15010178
M3 - Review article
AN - SCOPUS:85145971805
SN - 2073-4441
VL - 15
JO - Water (Switzerland)
JF - Water (Switzerland)
IS - 1
M1 - 178
ER -