T1 - Water cut-off performance of H-Jointed steel pipe sheet piles with H-H joints attaching water-swelling materials
AU - Inazumi, Shinya
AU - Kimura, Makoto
AU - Kakuda, Toshimitsu
AU - Kobayashi, Masakatsu
PY - 2011/12
Y1 - 2011/12
N2 - In this research, under various conditions, we evaluate the water cut-off performance of H-jointed steel pipe sheet piles (SPSPs) with the H-H joints attaching water-swelling materials which are components of SPSPs for water cut-off in a coastal waste landfill site. Specifically, we research the water cut-off performance when these H-H joints have foreign particles, when they are in a wet-dry cyclic condition, and when the water-swelling material has deteriorated. As a result of this research, it has been found that in any of the above cases, H-jointed SPSPs with H-H joints attaching water-swelling materials are capable of providing water cut-off performance, and meet seepage control work standards as long as they are under less than certain pressure levels to be considered in coastal waste landfill sites. Also, it has been proved that the above conditions do not affect the water cut-off performance of H-jointed SPSPs with H-H joints attaching water-swelling materials.
AB - In this research, under various conditions, we evaluate the water cut-off performance of H-jointed steel pipe sheet piles (SPSPs) with the H-H joints attaching water-swelling materials which are components of SPSPs for water cut-off in a coastal waste landfill site. Specifically, we research the water cut-off performance when these H-H joints have foreign particles, when they are in a wet-dry cyclic condition, and when the water-swelling material has deteriorated. As a result of this research, it has been found that in any of the above cases, H-jointed SPSPs with H-H joints attaching water-swelling materials are capable of providing water cut-off performance, and meet seepage control work standards as long as they are under less than certain pressure levels to be considered in coastal waste landfill sites. Also, it has been proved that the above conditions do not affect the water cut-off performance of H-jointed SPSPs with H-H joints attaching water-swelling materials.
KW - Cutoff wall
KW - H-jointed steel pipe sheet pile with H-H joint
KW - Hydraulic conductivity
KW - Joint
KW - Permeability test
KW - Steel pipe sheet pile
KW - Waste landfill site
KW - Water-swelling material
UR - http://www.scopus.com/inward/record.url?scp=84866867490&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84866867490&partnerID=8YFLogxK
U2 - 10.3208/sandf.51.1019
DO - 10.3208/sandf.51.1019
M3 - Article
AN - SCOPUS:84866867490
SN - 0038-0806
VL - 51
SP - 1019
EP - 1035
JO - Soils and Foundations
JF - Soils and Foundations
IS - 6
ER -